§ 18-122. Application; issuance.
(a)
Generally. Application for a certificate of occupancy shall be made at the same time as the application for a building permit, and the information required shall be included on the form for the building permit.
(b)
Single-family residences and duplexes. Upon written request to the building official, the certificate of occupancy or certificate of completion shall be issued within three days after the erection or structural alteration of such building or part of the building has been completed in conformity with this article as per final inspections by the building department. In addition, the final lot grading survey must adhere to requirements for submitting plans for new and remodel residential construction. Copies of the publication pertaining to requirements are available upon request from the building department.
(c)
Multifamily, commercial, industrial and all buildings not otherwise provided for. Upon written request to the building official, the certificate of occupancy or certificate of completion shall be issued within three days after the erection or structural alteration of such building or part of building has been completed in conformity with this article as per final inspections from the building department. Also required are final sign-offs from the engineering, fire and utility departments for their assigned inspections, if applicable.
(Code 1988, § 6-124; Ord. No. 96-25, § I, 12-19-96; Ord. No. 02-04, § 2, 3-28-02)