§ 88-14. Additional fees for road, drainage, water, or wastewater facilities.


Latest version.
  • Except in the event of an emergency, no road, drainage or water or wastewater utility installation shall be performed (1) before sunrise and after sunset, (2) nor between the hours of 5:00 p.m. and 7:00 a.m., (3) nor on Sunday and (4) nor any holiday of the city. "Regular working hours" shall be between 7:00 a.m. and 5:00 p.m. and shall be established by the city at the preconstruction meeting and shall not exceed eight hours per day and 40 hours per week. If construction or maintenance work for roads, drainage or water and wastewater utilities requires operations during other than regular working hours, the contractor shall obtain written permission of the city at least 48 hours in advance of starting such work, and shall set forth the proposed schedule for overtime to give the city ample time to arrange for their personnel to be at the site of work. The contractor shall be invoiced and pay for all additional charges to the city on account of such overtime at the rates, as established from time to time by the city manager. Work on weekends shall be charged a four-hour minimum. Such additional charges shall be a subsidiary obligation of the contractor and no extra payment shall be made by the city on account of such overtime work.

(Ord. No. 02-41, § II, 10-24-02; Ord. No. 07-39, § 2, 7-12-07)