§ 78-92. Measurement of processed waste characteristics.
Latest version.
Processed waste characteristics used to calculate industrial cost recovery charges shall be measured or estimated by the city periodically. Each industrial user subject to industrial cost recovery charges shall provide and maintain a monitoring manhole at each location where the industrial user connects with the treatment works, which manhole is located and constructed in a manner acceptable to the city.
(Code 1988, § 22-72)