No telecommunications system franchise shall be deemed to expressly or impliedly authorize
the grantee to construct or install poles or wire-holding structures within a right-of-way
for the purpose of placing cables, wires, lines or otherwise, without the written
consent of the city for the public right of way within which the poles or structures
are situated. Such consent shall be given by right-of-way utilization permit upon
such terms and conditions as the city may prescribe, which shall include a requirement
that the grantee perform, at the grantee's sole expense, all tree trimming required
to maintain the poles clear of obstructions.
(Ord. No. 99-46, § 1, 8-12-99)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');