§ 46-61. Burn permits.  


Latest version.
  • Section 10.11.1.1. of NFPA 1 is amended to read as follows: Permits shall be obtained from the city for all open fires. During construction or demolition of any building or structure, no waste materials or rubbish may be disposed of by burning. Burn permits, if issued, are subject to the following:

    (1)

    Period of issuance. Burn permits shall be issued for a five-day period and for the hours as specified on the permit.

    (2)

    Grounds for revocation/denial. Burn permits shall be revoked or denied if the fire department determines that the burning is detrimental to surrounding property or persons, or that conditions may cause the burning to be unsafe or the burn permit is issued in error or in contravention to the Code.

    (3)

    Permit fee. The fee for a burn permit issued pursuant to this section is a nonrefundable fee to be adopted and amended from time to time by resolution of the city commission and shall be collected by the building department.

(Ord. No. 05-20, § 3, 3-24-05; Ord. No. 10-23, § IV, 4-8-10)