§ 110-363. Modifications to county right-of-way utilization regulations.


Latest version.
  • The following specific modifications are made to the county's right-of-way utilization regulations adopted in this article:

    (1)

    Section 21-174 is amended to read as follows: "Fines for violations of the provisions of this article shall be as set by the city commission."

    (2)

    Section 21-176(a)(1) is amended to read as follows: "Chapter 110 of the Code of Ordinances—City of Winter Garden, Florida (Subdivisions)."

    (3)

    Section 21-176(a)(2) is amended to read as follows: "Orange County Road Construction Specifications as adopted and modified by the City of Winter Garden."

    (4)

    Section 21-176(a)(3) is amended to read as follows: "Chapter 78 of the Code of Ordinances—City of Winter Garden, Florida (Utilities)."

    (5)

    Section 21-176(a)(10) is added to read as follows: "Chapter 62 of the Code of Ordinances—City of Winter Garden, Florida (Streets and Sidewalks)."

    (6)

    Section 21-196(b) is amended to read as follows: "Applications may be obtained at the city engineer's office at 238 West Smith Street, Winter Garden, Florida 34787."

    (7)

    Section 21-200(a) is amended to read as follows: "Fees for right-of-way utilization permits shall be set by the city commission, and except as provided herein, a receipt for said payment shall be presented to the engineering department upon submission of the application."

    (8)

    Section 21-200(b) is amended to read as follows: "Checks, money orders, cash or other acceptable forms of payment will be payable to the board of county commissioners for the exact fee amount. Payment shall be made at the City Municipal Complex located at 251 West Plant Street, Downtown Winter Garden. Prior to payment, confirm required fee amount with the engineering department."

    (9)

    Section 21-231(b) is amended to read as follows: "Where possible, all longitudinal underground facilities should be placed as follows:

    "Water and Sewer—under roadway

    "Gas—between curb and sidewalk

    "TV Cable, Power and Telephone—behind sidewalk (provided r/w or "easement available)."

    (10)

    Section 21-232(a)(3) is amended to read as follows: "Air jetting is permitted up to 2″ casing. Tunneling and water jetting are prohibited."

    (11)

    Section 21-233(a) is amended to read as follows: "All street, curb, sidewalk, driveway, curb, etc., construction shall be in accordance with the Orange County Road Construction Specifications as modified by the city, and chapters 62 and 110 of the city Code."

    (12)

    Section 21-233(j) is amended to read as follows: "When traffic signs are located within the area of approved installation of construction, the permittee is required to notify the public works department to arrange for removal and/or relocation. Costs incurred by the county for the removal and resetting, or relocation of signs will be billed to the permittee."

    (13)

    Appendix A is amended to read as follows:

    a.

    All references to "board of county commissioners" are replaced with "city commission."

    b.

    All references to "county" or "Orange County" are replaced with "city" or "City of Winter Garden" respectively.

    c.

    References to "county engineer" are replaced with "city engineer."

    d.

    Under Instructions and Conditions, revise line 5, "Orange County Standards and Specification for Sewerage and Water Facilities," to read "Orange County Standards and Specifications for Sewerage and Water Facilities as Adopted and Modified by the city."

    e.

    Under Instructions and Conditions, revise line 6, "Orange County Code Right-of-Way Utilization Regulations," to read "Orange County Code, Right-of-Way Utilization Regulations as Adopted and Modified by the city."

(Code 1988, § 19-229)